Sewerage Scheme for Ponda Municipal area including Curti, Bandora, Kavelem and other Urban agglomerates in Ponda Taluka – Goa.

 Jun, 19 - 2014   news

I) Need of sewerage Treatment Plant:

1)    Unsafe disposal of sewage into the river Zuari thus contaminating water bodies further in the near by areas.

2)    The area has high housing demand which has generated problems of disposal of sewage.

3)    The area has great tourism potential hence situation in tourist season would be bad due to high extraction levels of water and more generation of waste.

4)    The area is having 24 hours of water supply hence the per capita use of water is also maximum so there is need of upgradation from soak pit system to underground drainage system which would efficiently dispose the sewage water generated.

5)    Water borne diseases are prevalent in the area due to contamination.

6)    The project area depends on the inland water bodies from the ZuariRiver for occupational activities like farming, fishing and tourism.

7)    The fertility of land deteriorates due to improper disposal of waste water.

8)    The artificial ponds created for facilitating fishing activities have getting polluted due to disposal of raw sewage into the nallah which passes through the entire area.

II) Salient features:

1)    Name of the project :

Sewerage scheme for Ponda Municipal area including Curti, Bandora, Kavelem and other Urban agglomerates in Ponda Taluka – Goa.

2)    State & District : Goa (North Goa)

3)    Project area :

i) Ponda
ii) Curti
iii) Bandora
iv) Kavelem
v) Mardol
vi) Mangeshi

4) Population:

As per 2001 census: 48615

Year

2015

2030

2045

Stages considered

Base Year

Intermediate

Ultimate

Projected population

82388

112212

148630

Rate of water supply (lpcd)

135

135

135

Water Supply requirement In MLD

11.12

15.14

20.07

Waste water at 80% of WS in MLD and 10% infiltration

10.68

14.54

19.26

Total Sewage generated in MLD

10.68

14.54

19.26

5) Proposed Sewerage scheme: 10 Sewage District proposed.

Sewerage Districts

Sr. No. District Area Length of NetworkM Population at Design life – 2045 yr Pumping Station
1. I Curti 11361 14174
2. II Curti 12682 11241
3. III Curti, Ponda 23905 12818
4. IV Curti, Ponda, Kavelem 14449 16706
5. V Ponda, Kavelem 36215 20641
6. VI Ponda, Kavelem, Bandora 47227 26168
7. VII Bandora 8549 3445
8. VIII Kavelem, Bandora 12501 16512
9. IX Curti, Ponda 13244 17862 PS-1 of 5m diameter
10. X LaxmiNarsimhaTemple 5074 1813 PS-2 of 5 m diameter
11. XI Mangeshi & MahalsaDeviTemple 22851 7250
Total 208058 148630

Sewerage Treatment Plant of Capacity 15 MLD of SBR/ Cyclic ASP.

Total Cost of the Scheme is 403 Crores.

Peak Factor: 2.25

Main Pumping Station at STP of 8 m diameter.

IV) Location of STP in the area under project consideration:

The topography of the project area is mountainous region with depressions at certain points covering forest area. The area is close to River Zuari and is low lying near the river Thus the area is mixture of mountains and low lying sea river side lands. Apart from the topography the location of STP depends on location of discharge point of the treated sewerage from the intake of water works, the other utilities like land available, power supply conditions, roads and communication means etc. was considered to locate the sewage treatment plant.

The plant is proposed to be located at Bandivde in the Madkaim Constituency close to Madkai Industrial Estate  and vicinity of ZuariRiver. The entire project area is divided into 10 districts to facilitate the collection of the sewerage from the intake of water works.

V) Total Expenditure of the project:

Details of Project Cost:

i) Collection & conveyance: Rs  305.19 crores
ii) Pumping Stations : Rs  2.31      crores
iii) Pumping mains : Rs  0.64      crores
iv) Pumping machineries and Allied works Rs  1.81      crores
v) Automation –SCADA SYSTEM Rs   5.23     crores
vi) 1 No. Sewage Treatment Plant Rs   43.41   crores
vii) Miscellaneous Works Rs.  3.27     crores
viii) Recycling of Treated Waste water(3MLD) Rs.  1.55     crores
ix) Net Cost Rs.  366.41 crores
x) Escalation Charges at 7% Rs.  25.65  crores
xi) Contingencies at 3% Rs. 11.76    crores
xii) Total 1: Rs. 403.82    crores
xiii) Total cost of the project in crores: Rs. 403.82    crores

Vi) Project Implementation key milestones:

i) Collection & conveyance: April 2011 to March 2013
ii) Sewage Pumping Station  : January 2011 to March 2013
iii) Pumping machinery & Allied works : July 2011 to March 2013
iv) Automation SCADA: January 2012 to March 2013
v) STP(1 Nos.) : April 2011 to March 2013
vi) Vehicle and other cleaning equipment : July 2011 to March 2013
vii) Capacity building : July 2012 to March 2013
viii) Miscellaneous works : July 2012 to April 2013

 

Likely Impacts of the Project:

I) Improvement in sanitation condition by providing complete sewerage network.

II) Reduction in spread of water borne diseases.

III) Protect the natural ecosystem of river Zuari and inland water streams.

IV) Improvement in environmental condition of Urban area of Ponda Municipality.