Need of sewerage Treatment plant:
1) Unsafe disposal of sewage into the river Mandovi.
2) Rise water table during monsoon causing overflow of septic tank.
3) The area being close to Panaji city has high housing demand which would generate problems of disposal of sewage.
4) The area has great tourism potential hence situation in tourist season would be bad due to high extraction levels of water and more generation of waste.
Salient features:
1) Name of the project: Sewerage scheme for Porvorim and its surrounding areas in Bardez Taluka – Goa.
2) State & District : Goa & North Goa
3) Project area :
i) Pilerne
ii) Penha De Franca
iii) Reismagos
iv) Nerul
v) Socorro
vi) Salvador Do Mundo
vii) Pomburpa
4)Population:
As per 2001 census: 51443
Year |
2011 |
2026 |
2041 |
Stages considered |
Present |
Intermediate |
Ultimate |
Projected population |
67967 |
95561 |
134702 |
Rate of water supply (lpcd) |
135 |
135 |
135 |
Water Supply requirement in MLD |
9.18 |
12.90 |
18.08 |
Waste water at 80% of WS in MLD |
7.34 |
10.32 |
14.55 |
Infiltration at 5% of Sewage |
0.37 |
0.52 |
0.73 |
Total Sewage generated in MLD |
7.71 |
10.84 |
15.28 |
5)Proposed Sewerage scheme: 3 nos. of sewerage district.
Sewerage District 1 | Sewerage District 2 | Sewerage District 3 | |
Area | Pilerne,Penha De Franca (part), Nerul & Reismagos | Socorro | Salvador Do Mundo, Penha De Franca (part) ,Pomburpa |
Area in Sq km | 23.69 | 12.50 | 18.87 |
Population year 2041 | 69640 | 29032 | 36032 |
Water supply requirement In MLD | 9.4 | 3.92 | 4.86 |
Sewage generated at 80%WS in MLD | 7.52 | 3.14 | 3.89 |
Infiltration at 5% of sewage | .38 | 0.16 | 0.19 |
Total Sewage generated In MLD | 7.89 | 3.30 | 4.09 |
STP with its capacity | 1 No. of 8 MLD | 1 No. of 3.3 MLD | 1 No. of 4MLD |
No. of Pumping Stations | 10 Nos. | 4 nos. | 12 Nos. |
Sewerage System proposed in Km | 94.62 | 27.774 | 62.140 |
Treatment process proposed | Membrane Biological Reactor | Membrane Biological Reactor | Membrane Biological Reactor |
Cost of the project in (Rs crores) |
Rs 210.00 Crores |
IV)Location of STP in the area under project consideration:
The topography of the project area is hilly area sloping towards river Mandovi, location of discharge of the treated sewerage from the intake of water works and the other utilities like land available, power facilities, road access and communication facilities etc. was considered to locate the sewage treatment plant.
The plants are proposed to be located at three places thus dividing the entire project area into 3 distinct sewage district to facilitate the proper use of the sewage treatment plant. The locations of the three plants are at
1) Nerul Dhareshwar
2) Salvador Do Mundo
3) Giri.
V) Total Expenditure of the project:
Details of Project Cost:
i) |
Collection & conveyance : |
Rs 135.79 Crores |
ii) |
Pumping Stations : |
Rs 3.94 Crores |
iii) |
Pumping machineries : |
Rs 4.53 Crores |
iv) |
Pumping mains
|
Rs 4.77 Crores |
v) |
3 Nos. of STP(total 14 MLD): |
Rs 17.00 Crores |
vi) |
Miscellaneous |
Rs 4.07 Crores |
vii) |
SCADA: |
Rs 7.04 Crores |
viii) |
vii) Equipments and Vehicles: |
Rs 5.00 Crores |
ix) |
Capacity Building: |
Rs 5.40 Crores |
x) |
Disposal works |
Rs 3.00 Crores |
Net cost: |
Rs 190.54 Crores |
|
Escalation Charges at 7 %: |
Rs 13.34 Crores |
|
Net cost after escalation in crores: |
Rs 203.88 Crores |
|
Add 3% contingencies Net Rs.: |
Rs 6.12 Crores |
|
Total cost of the Project: |
Rs 210.00 Crores |
Vi) Project Implementation key milestones:
i) |
Collection & conveyance : |
July 2010 to March 2013 |
ii) |
Sewage Pumping Station : |
Oct 2010 to June 2014 |
iii) |
Pumping machinery |
June 2011 to March 2013 |
iv) |
Pumping main:
|
July 2011 to March 2014 |
v) |
STP(3 Nos.) : |
July 2010 to June 2014 |
vi) |
SCADA: |
Jan 2012 to March 2013 |
vii) |
Miscellaneous works: |
Oct 2010 to June 2014 |
viii) |
Vehicles & Equipments: |
April 2012 to March 2013 |
ix) |
Appointment of consultant: |
Between 2009 to 2010 |
x) |
Planning /Designing/Tender preparation: |
2009 to 2010 |
Tender Invitation between periods of | |
Collection & Conveyance | July 2010 to Sept 2010 |
Pumping Station | Oct 2010 to Dec 2010 |
Pumping Machinery | June 2011 to August 2011 |
Pumping Main | July 2011 to Sept 2011 |
STP | July 2010 to Sept 2010 |
SCADA | Jan 2012 to August 2012 |
Miscellaneous Works | Oct 2010 to Dec 2010 |
Vehicles &Equipments | April 2012 to June 2012 |
xi) Construction of work : Oct 2010 to March 2013
xii) Installation & commissioning : January to March 2013
xiii) Project Status : Provide list of approvals/clearances
Likely Impacts of the Project :
I) Clean Environment in Porvorim and its surrounding areas in Bardez Taluka – Goa.
II) Reduction in water borne diseases.
III) Improvements in the status of health.
IV) Protection to marine life as well as to safeguard pollution of human food chain.
v) Improvement in socio economical conditions by attracting more tourists.